Case Studies

Receipts, not promises.

We could tell you we’re great, but we’d rather show you. Here’s a sample of real projects, real timelines, and real results.

2–4 wks

Avg. Delivery Time

30+

Projects Shipped

100%

On-Time Delivery

5/5

Client Satisfaction

GrowthLoop

SaaS

Analytics dashboard MVP that helped close a $1.2M seed round

Challenge: GrowthLoop had a solid backend but nothing to show investors. Their seed round was closing in 4 weeks and they needed a demo that looked like a product, not a prototype.

Solution: We built a responsive Next.js dashboard with real-time charts, user management, and Stripe billing. Deployed to Vercel with CI/CD. Looked like they’d been building for a year.

3 weeks

2 engineers

MVP live in 3 weeks

Helped close $1.2M seed round

200+ beta users in first month

CareBridge

Healthcare

Replaced paper forms with a digital intake system in 4 weeks

Challenge: A healthcare clinic drowning in paper. Staff spent more time on data entry than patient care. Their existing “solution” was a shared Google Drive folder. Seriously.

Solution: Built a patient intake portal with digital forms, document upload, and EHR integration. Mobile-friendly for patients, streamlined for staff. HIPAA-conscious from the start.

4 weeks

2 engineers

60% less admin time

Patient satisfaction up 40%

Delivered in 4 weeks

PriceWise

E-Commerce

AI product descriptions for 10K SKUs (35% traffic boost)

Challenge: 10,000 products with garbage descriptions. Writing them manually would take months and cost a fortune. SEO was suffering and so was conversion.

Solution: Built an LLM pipeline that generates unique, SEO-optimized descriptions from product data. Added a review interface so their team could approve in batches instead of writing from scratch.

3 weeks

1 engineers

10K descriptions in 2 days

35% organic traffic increase

Delivered in 3 weeks

FieldWork

Construction

Scheduling app that eliminated 80% of job conflicts

Challenge: 50 contractors managed via spreadsheets and group texts. Jobs fell through the cracks weekly. The operations manager was developing an eye twitch.

Solution: Built a scheduling app with drag-and-drop calendars, push notifications, GPS check-ins, and automatic conflict detection. Mobile-first because nobody on a job site uses a laptop.

5 weeks

2 engineers

80% fewer scheduling conflicts

2 hrs/week saved per PM

Delivered in 5 weeks

Your project could be next.

Tell us about the outcomes you need and we will scope an engagement built to deliver them.

Start a Conversation